Contact Us

Featured Programmes

Horizontal Directional Drilling (HDD) Machine Operator

2 days(Lecture, VR Practical, and Assessment)

RM 1,300 - 1,500

Training Outline

  • Introduction of HDD
  • HDD Rigs and Equipment
  • Technical Feasibility
  • Safety and Operations
  • VR HDD Simulator

Horizontal Directional Drilling (HDD) Pilot Bore Operator

2 days(Lecture, VR Practical, and Assessment)

RM 1,300 - 1,500

Training Outline

  • Introduction of HDD
  • HDD Guidance System
  • HDD Locating Procedure
  • VR Locating Practice

CA1C Internal Cabling Fiber Optic

2 days(lecture and exam)

RM 550

Training Outline

  • General knowledge HSBB/FTTH
  • Cable and Infrastructure
  • Internal Wiring Fiber
  • FTTH Fiber Testing & CPE Setup

CA2C Fiber Optic Cable Network

3 days(lecture and exam)

RM 900

Training Outline

  • Introduction to fiber optic cable
  • Installation of sub-duct
  • Fiber Optic Cable pulling for underground and overhead
  • Fiber Optic Cable jointing
  • Fiber Optic Cable testing

SKM Level 3 for Fiber Optic Installation and Maintenance

1,960 hours (lecture, practical, soft skills and exam)

RM 6,600

Training Outline

  • Fiber Optic Cable Network Project Pre Installation
  • Fiber Optic Cable Network Outside Plant Installation
  • Fiber Optic Cable Network Inside Plant Installation
  • Fiber Optic Cable Network Jointing
  • Fiber Optic Cable Network Testing and Commissioning
  • Fiber Optic Cable Network Maintenance
  • Fiber Optic Cable Network Installation & Maintenance Supervision

Huawei Certified Specialist For Home Service Activation

5 + 1 days(lecture, practical and exam)

RM 700

Training Outline

  • Indoor Fiber Installation/li>
  • Indoor Copper Cabling
  • Client Service Activation Basics
  • Operator Service Activation Basics

Fiber Optic Installation and Maintenance (2 + 4)

2 weeks(lecture, practical, and exam) and 4 months on-job-training

RM 500

Training Outline

  • Overview of HSBB network
  • Types of fiber optic cable and Optical Distribution Network components
  • Inside Plant Fiber Optic Cable Installation
  • Outside Plant Fiber Optic Cable Installation
  • Fiber Optic Cable jointing
  • Fiber Optic Cable Network Maintenance
  • Fiber Optic Cable Network Maintenance

Wireless Broadband Installation (2 + 4)

2 weeks(lecture, practical, and exam) and 4 months on-job-training

RM 500

Training Outline

  • Overview of wireless broadband network
  • Site survey
  • Wireless infrastructure Installation, Termination and Testing
  • Fiber Optic Cable Installation, Jointing and Testing

See Our Latest Programmes Specialized For You!

Our Prgrammes
crossmenu